During Septa's Reading Division transition to Conrail-contracted operations in April, 1976, the "West Trenton to Philadelphia" May 23, 1976 timetable shows the Reading Lines diamond replaced with the new "ConRail" logo, with lines above and below. In addition to the logo change, "Reading Division" was added alongside the logo. As seen on other RD Division tmetables following the Conrail startup, the May 23 timetable appears to be the first change to show the Conrail transition. Conrail was now reflected as the new operator of the commuter line that ran RDG MU's, RDC's, and FP7A's.
Photographer
Photo Date
Submitted by Alan Page on Sun, 09/27/2020 - 21:37