During Septa's Reading Division transition to Conrail-contracted commuter operations in April, 1976, the "Philadelphia and Wayne Junction" May 23, 1976 timetable shows the Reading Lines diamond replaced with the new "ConRail" logo, with lines above and below.
In addition, "Reading Division" was added alongside the logo.
The October 31, 1976 revision of the timetable shows the wheels on track logo with "CONRAIL above."
As seen on other RDG Division tmetables following the Conrail startup, the May timetable revision appears to be the first to show the ConRail transition.
Photographer