PPLX "Ridge" train with assigned ex-CR SD60Is on NS 534 train for Talen Energy's Montour Power Plant. Coal train on the NS Watsontown Secondary is within a mile of its destination. This was the first "Ridge" train load in four months fifteen days.
CR 5608 → NS/LTEX 6737
CR 5596 → NS/LTEX 6729
CR5582 → NS 6721 → PSU 2020
Builder
EMD
Post Conrail Owner(s)
NS
Other