A 1982 shot of the Cresson helper maintenance facility, taken from the Cresson Secondary bridge over the mainlines. The signals on the right edge of the photo were the eastbound signals for MO interlocking. When the bridge was removed in 1995 as part of the double-stack clearance improvement project, these signals were replaced with Type G signals.
Photographer
Photo Date
Photo Location Name
Pittsburgh Line

40.466164, -78.58874

Submitted by CRHS Admin on Sat, 09/26/2020 - 23:20