Conrail C40-8Ws 6167 and 6166 appear to be making their first trip east after being delivered by GE. Both units show as being built in the prior month, February 1993. The duo is assisted by older Conrail power in bringing CGAL into Allentown Yard, passing through the interlocking at CP ALLEN.

Photographer
Photo Date
Photo Location Name
CP Allen
Conrail Road Number
6167
6166
Builder
General Electric

40.599913193454, -75.446866916162

Submitted by Rob Pisani on Thu, 11/19/2020 - 22:11