Northbound freight with ex-EL 2568 GP35 leader.
With the installation of CP-WAT interlocking at M.P. 241.7 on the Buffalo Line complete, the need to use Watsontown siding through the borough to access the Watsontown Secondary was eliminated. At this time, that portion of Watsontown siding is yet to be dismantled.
Later the Watsontown freight house (white building) would be razed and the freight house siding removed.
Conrail Road Number
CR 3674
Builder
EMD
See More