A Westbound CR freight is working hard as it blasts around the curve at the East end of the Portage Bridge. There was no 10mph slow order in effect at this time for trains crossing the bridge. A moment after this photo was taken the train passed thru the spring switch, which was the West end of double track, and roared out across the Portage Bridge.
Conrail Road Number
2858
Builder
General Electric
Predecessor Paint Scheme
PC
See More