The 1994 brought an SPPO (SPringfield, MA.-POrtland, ME.) up the Conn River line from Springfield on Oct. 16, 1982. He left the train on the Deerfield loop and is on his way to the "pit" to get another locomotive before continuing the trip.
Conrail Road Number
1994
Builder
General Electric
See More